This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Fields Parkway from FM 423 to Teel Parkway includes, grading, paving, drainage, and a roundabout at Teel Parkway. Pedestrian improvements for this project include 6-12' wide sidewalk with pedestrian ramps and crosswalks throughout, as well as a share