PROJECT
- Project Name:
- SH 99 SBFR
- Project Number:
- TABS2023008315
- Facility Name:
- CSJ: 3510-04-055
- Location Address:
- From: Westheimer Parkway To: Cinco Ranch Blvd
- Katy, TX 77494
- Location County:
- Fort Bend
- Start Date:
- 9/1/2023
- Completion Date:
- 10/1/2024
- Estimated Cost:
- $11,305,534
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Construction of frontage road and ramp reversal.
- Square Footage:
- 32,928 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Inspection Complete
OWNER
- Owner Name:
- TxDOT District: Houston
- Owner Address:
- 7600 Washington Ave
- Houston, Texas 77007
- Owner Phone:
- (713) 802-5000
- Contact Name:
- Carlos Zepeda, P.E.
DESIGN FIRM
- Design Firm Name:
- TEDSI Infrastructure Group, Inc.
- Design Firm Address:
- 738 Highway 6 South, Suite 430
- Houston, Texas 77079
- Design Firm Phone:
- (281) 589-7257