ABIA Existing Terminal Centralized Baggage Handling System Upgrades
Project Number:
TABS2023010706
Facility Name:
Austin-Bergstrom International Airport
Location Address:
3600 Presidential Blvd.
Austin, TX 78719
Location County:
Travis
Start Date:
3/1/2023
Completion Date:
6/30/2023
Estimated Cost:
$881,000
Type of Work:
New Construction
Type of Funds:
This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
reconfig Checkpoint 2W and 2E, expansion of the checked baggage system. Scope at 2W: screening lane, with equipment, reconfig system and 1 existing room into a private room. Scope 2E: reconfig of storefront system at existing egress.