This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Reconstruction of the northbound frontage road with 2 to 3 travel lanes, 1 foot curb offsets on both sides, 5 to 6 feet wide sidewalk on the east side of the roadway, curb ramps, illumination, signals, signing and striping.