PROJECT
- Project Name:
- US 290 (CSJ: 0114-10-101)
- Project Number:
- TABS2023017775
- Facility Name:
- CSJ: 0114-10-101
- Location Address:
- US 90 at FM 1155
- Chappell Hill, TX 77426
- Location County:
- Washington
- Start Date:
- 9/1/2023
- Completion Date:
- 7/30/2025
- Estimated Cost:
- $81,660
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Roadway widening with installation of new concrete sidewalk, sidewalk extensions, curb ramps, pedestrian signals and crosswalks.
- Square Footage:
- 100 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 733-1748
OWNER
- Owner Name:
- TxDOT District: Bryan
- Owner Address:
- 2591 North Earl Rudder Freeway
- Bryan, Texas 77803
- Owner Phone:
- (979) 778-9764
- Contact Name:
- Jace Lee, P.E.
DESIGN FIRM
- Design Firm Name:
- H.W. Lochner, Inc.
- Design Firm Address:
- 810 Hesyters Crossing
- Round Rock, Texas 78681
- Design Firm Phone:
- (737) 704-3080