This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Fully reconstruct the roadway to convert it from an elevated asphalt roadway with roadside ditches to a curb and gutter concrete roadway with sidewalks. Improve the drainage with new upgraded storm sewer boxes.