PROJECT
- Project Name:
- IH 30 (CSJ: 0009-11-267)
- Project Number:
- TABS2024001557
- Facility Name:
- CSJ: 0009-11-267
- Location Address:
- From: IH 635 To: Bass Pro Drive (in Garland)
- Mesquite, TX 75150
- Location County:
- Dallas
- Start Date:
- 10/1/2024
- Completion Date:
- 10/1/2027
- Estimated Cost:
- $137,374,124
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- IH 635 to Bobtown Rd: Reconstruct and Widen from 8 to 11 lane roadway and ramp modifications; Bobtown Rd to Bass Pro Dr: Operational Improvements.
- Square Footage:
- 73,776 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Review Complete
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 733-1748
OWNER
- Owner Name:
- TxDOT District: Dallas
- Owner Address:
- 4777 E. Highway 80
- Mesquite, Texas 75150
- Owner Phone:
- (214) 320-6200
- Contact Name:
- Nathan Petter, P.E.
DESIGN FIRM
- Design Firm Name:
- Bridgefarmer & Associates
- Design Firm Address:
- 2350 Valley View Lane, Suite 600
- Dallas, Texas 75234
- Design Firm Phone:
- (972) 231-8800