PROJECT
- Project Name:
- CORRIDOR AND ELEVATOR LOBBY REMODEL
- Project Number:
- TABS2024006029
- Facility Name:
- BROOKHOLLOW CENTRAL III
- Location Address:
- 2950 N. LOOP FWY. W. LEVEL 8
- Houston, TX 77092
- Location County:
- Harris
- Start Date:
- 12/18/2023
- Completion Date:
- 3/11/2024
- Estimated Cost:
- $125,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- INTERIOR RENOVATION OF EXISTING INTERIOR BUILD OUT
- Square Footage:
- 2,705 ft 2
- Are the private funds provided by the tenant?
- Yes
- Current Status:
-
Project Closed
RAS
- RAS Name:
- RANDY L,STOW
- RAS #:
- 1298
- RAS Address:
- 401 FRANKLIN ST STE 2400-138
- HOUSTON, TX 77002
- RAS Phone:
- (713) 864-8494
OWNER
- Owner Name:
- HERTZ HOUSTON BROOKHOLLOW LP
- Owner Address:
- 15303 VENTURA BLVD SUITE 800
- SHERMAN OAKS, California 91403
- Owner Phone:
- (713) 255-2340
- Contact Name:
- MARY HOOVER
DESIGN FIRM
- Design Firm Name:
- ZIEGLER COOPER ARCHITECTS
- Design Firm Address:
- 700 LOUISIANA ST SUITE 350
- HOUSTON, Texas 77002
- Design Firm Phone:
- 713.374.0079