PROJECT
- Project Name:
- IH 35 (CSJ: 0015-01-246)
- Project Number:
- TABS2024006228
- Facility Name:
- CSJ: 0015-01-246
- Location Address:
- From: South State Loop 340 To: 12th St.
- Waco, TX 76705
- Location County:
- McLennan
- Start Date:
- 1/1/2025
- Completion Date:
- 6/1/2028
- Estimated Cost:
- $176,593
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Reconstruct widen main lanes from 6 to 8 lanes. Reconstruct frontage roads and extend frontage roads where discontinuous and realign ramps.
- Square Footage:
- 156,465 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Review Complete
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 733-1748
OWNER
- Owner Name:
- TxDOT District: Waco
- Owner Address:
- 100 S. Loop Drive
- Waco, Texas 76704
- Owner Phone:
- (254) 867-2700
- Contact Name:
- Clayton Zacha, P.E.
DESIGN FIRM
- Design Firm Name:
- HNTB Corporation
- Design Firm Address:
- 604 Taylor St. # 1800
- Fort Worth, Texas 76102
- Design Firm Phone:
- (682) 707-3020