PROJECT
- Project Name:
- Blackhawk Blvd Sidewalk Project
- Project Number:
- TABS2024008459
- Facility Name:
- Blackhawk Blvd
- Location Address:
- Blackhawk from Scarsdale Blvd to Beltway 8
- Houston, TX 77089
- Location County:
- Harris
- Start Date:
- 9/11/2024
- Completion Date:
- 6/14/2025
- Estimated Cost:
- $2,832,868
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Construct new sidewalks on both sides of Blackhawk Blvd
- Square Footage:
- 140,820 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Review Complete
RAS
- RAS Name:
- JANEL CARONA,BLOOM
- RAS #:
- 120
- RAS Address:
- 11555 BEAMER RD STE 500
- HOUSTON, TX 77089
- RAS Phone:
- (832) 407-5816
OWNER
- Owner Name:
- Harris County Engineering Department
- Owner Address:
- 1111 Fannin Street 11th Floor
- Houston, Texas 77002
- Owner Phone:
- (713) 274-1911
- Contact Name:
- Abu Almamun
DESIGN FIRM
- Design Firm Name:
- B2Z Engineering LLC
- Design Firm Address:
- 900 Threadneedle Ste 120
- Houston, Texas 77079
- Design Firm Phone:
- (832) 288-2755