PROJECT
- Project Name:
- FM 676
- Project Number:
- TABS2024010286
- Facility Name:
- Taylor Rd. to FM 2220 Ware Rd.
- Location Address:
- FM 676
- Mcallen, TX 78501
- Location County:
- Hidalgo
- Start Date:
- 1/1/2024
- Completion Date:
- 10/1/2025
- Estimated Cost:
- $9,503,059
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Four lane divided curb, gutter and sidewalk, asphalt concrete pavement road with traffic signals and storm drainage improvements.
- Square Footage:
- 791,898 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Review Complete
RAS
- RAS Name:
- ANTHONY,COVACEVICH
- RAS #:
- 97
- RAS Address:
- 401 SOUTHGATE CIR
- WESLACO, TX 78596
- RAS Phone:
- (956) 279-0910
OWNER
- Owner Name:
- Texas Dept of Transportation (TxDOT)
- Owner Address:
- 600 W. Expressway 83
- Pharr, Texas 78577
- Owner Phone:
- (956) 702-6100
- Contact Name:
- Rene Garza
DESIGN FIRM
- Design Firm Name:
- L&G Engineering Consultants
- Design Firm Address:
- 900 S. Stewart Rd., Ste. 4
- Mission, Texas 78572
- Design Firm Phone:
- (956) 585-1909