PROJECT
- Project Name:
- Lakeside Estates Sidewalks, Phase 3
- Project Number:
- TABS2024015834
- Facility Name:
- N/A
- Location Address:
- Multiple streets (St Mary's Dr, Dana Dr, etc)
- Hutto, TX 78634
- Location County:
- Williamson
- Start Date:
- 11/4/2024
- Completion Date:
- 6/19/2025
- Estimated Cost:
- $1,417,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Construction of approx 4,365 sy of sidewalk with 20 curb ramps, and replace of approx 3,230 sy of driveways
- Square Footage:
- 68,355 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- RODRIGO ALFONSO,MALDONADO GUILLEN
- RAS #:
- 1722
- RAS Address:
- STE G100 1101 S CAPITAL OF TEXAS HWY
- AUSTIN, TX 78746
- RAS Phone:
- (512) 450-4025
OWNER
- Owner Name:
- City of Hutto, TX
- Owner Address:
- 500 W. Live Oak Street
- Hutto, Texas 78634
- Owner Phone:
- (512) 759-4025
- Contact Name:
- Matt Rector, P.E. - City Engineer
DESIGN FIRM
- Design Firm Name:
- TranSystems Corporation
- Design Firm Address:
- 7000 N. Mopac Exwy, Suite 200
- Austin, Texas 78731
- Design Firm Phone:
- (512) 745-6136