PROJECT
- Project Name:
- Smithville NE/NW 2nd Street Drainage Improvements
- Project Number:
- TABS2024018033
- Facility Name:
- City of Smithville Right of Way Project
- Location Address:
- 2nd St. at Gresham, Olive, Main and Bandana Sts.
- Smithville, TX 78957
- Location County:
- Bastrop
- Start Date:
- 6/1/2024
- Completion Date:
- 6/30/2025
- Estimated Cost:
- $1,900,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- New sidewalks and drainage on several streets
- Square Footage:
- 13,000 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- EDDIE,HARE
- RAS #:
- 8
- RAS Address:
- 5855 FOSTER RD
- BRYAN, TX 77807
- RAS Phone:
- (979) 820-0149
OWNER
- Owner Name:
- City of Smithville
- Owner Address:
- 317 Main Street
- Smithville, Texas 78957
- Owner Phone:
- (512) 237-3282
- Contact Name:
- City Manager
DESIGN FIRM
- Design Firm Name:
- BEFCO Engineering, Inc.
- Design Firm Address:
- 485 N. Jefferson Street
- LaGrange, Texas 78945
- Design Firm Phone:
- (979) 968-6474