PROJECT
- Project Name:
- US 271, US 69 & FM 756 (CSJ: 0165-01-109, etc.)
- Project Number:
- TABS2024020865
- Facility Name:
- CSJ: 0165-01-109, etc.
- Location Address:
- Various Locations
- Tyler, TX 75708
- Location County:
- Smith
- Start Date:
- 10/1/2024
- Completion Date:
- 4/1/2025
- Estimated Cost:
- $1,431,950
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Safety improvement projects consisting of traffic signal improvements, sidewalks, pedestrian signals, curb ramps, and LED curve warning system.
- Square Footage:
- 4,974 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Review Complete
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 733-1748
OWNER
- Owner Name:
- TxDOT District: Tyler
- Owner Address:
- 2709 W. Front St.
- Tyler, Texas 75702
- Owner Phone:
- (903) 510-9100
- Contact Name:
- Steven Swindell, P.E.
DESIGN FIRM
- Design Firm Name:
- Halff
- Design Firm Address:
- 1121 ESE Loop 323, Suite 117
- Tyler, Texas 75701
- Design Firm Phone:
- (903) 617-5369