PROJECT
- Project Name:
- BP014- Bowie Middle School Cafeteria Addition
- Project Number:
- TABS2024022032
- Facility Name:
- Bowie Middle School
- Location Address:
- 700 Plantation Drive
- Richmond, TX 77406
- Location County:
- Fort Bend
- Start Date:
- 1/2/2025
- Completion Date:
- 10/15/2025
- Estimated Cost:
- $1,717,000
- Type of Work:
- Additions to Existing Building
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Ddition to existing cafeteria totaling 2500 sft
- Square Footage:
- 2,500 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Review Complete
RAS
- RAS Name:
- SHARAREH,ABDI
- RAS #:
- 1022
- RAS Address:
- 7171 HIGHWAY 6 N STE 285
- HOUSTON, TX 77095
- RAS Phone:
- (281) 507-9552
OWNER
- Owner Name:
- Fort Bend ISD
- Owner Address:
- 16431 Lexington Boulevard
- Sugar Land, Texas 77479
- Owner Phone:
- (281) 327-4438
- Contact Name:
- Jose Garcia
DESIGN FIRM
- Design Firm Name:
- cre8 Architects
- Design Firm Address:
- 3815 Montrose Blvd, Suite 123
- Hpuston, Texas 77006
- Design Firm Phone:
- (713) 526-2738