PROJECT
- Project Name:
- Water & Wastewater Group A Phase 3 - Package 1
- Project Number:
- TABS2024024730
- Facility Name:
- City of Bellaire Waterline and Sidewalk Infrastructure
- Location Address:
- 4906 Braeburn Dr
- Bellaire, TX 77401
- Location County:
- Harris
- Start Date:
- 10/1/2024
- Completion Date:
- 1/12/2026
- Estimated Cost:
- $110,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Removal and replacement of existing sidewalk to facilitate waterline construction.
- Square Footage:
- 17,400 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Registered
RAS
- RAS Name:
- KENNETH,OTTEN
- RAS #:
- 149
- RAS Address:
- 7171 HIGHWAY 6 N STE 285
- HOUSTON, TX 77095
- RAS Phone:
- (713) 480-3994
OWNER
- Owner Name:
- City of Bellaire
- Owner Address:
- 7008 S Rice
- Bellaire, Texas 77401
- Owner Phone:
- 713-662-8154
- Contact Name:
- Mark Velasquez
DESIGN FIRM
- Design Firm Name:
- ARKK Engineers
- Design Firm Address:
- 7322 Southwest Freeway, Suite 1040
- Houston, Texas 77074
- Design Firm Phone:
- (713) 400-2755