PROJECT
- Project Name:
- San Marcos Mixed Use Building
- Project Number:
- TABS2024025956
- Facility Name:
- The Orient
- Location Address:
- 117 Meiners St.
- San Marcos, TX 78666
- Location County:
- Hays
- Start Date:
- 1/15/2025
- Completion Date:
- 5/1/2026
- Estimated Cost:
- $3,500,000
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- 3 Story Mixed use building with ground floor retail shell and 9 apartment units on the second and third floors.
- Square Footage:
- 14,700 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Review Complete
RAS
- RAS Name:
- DAVID C,DEMING
- RAS #:
- 129
- RAS Address:
- 16222 CRYSTAL HILLS DR
- AUSTIN, TX 78737
- RAS Phone:
- (512) 940-4226
OWNER
- Owner Name:
- Double Feng LLC
- Owner Address:
- 711 Sturgeon St.
- San Marcos, Texas 78666
- Owner Phone:
- (347) 862-8022
- Contact Name:
- Wade Lin
DESIGN FIRM
- Design Firm Name:
- Webber+Studio
- Design Firm Address:
- 1220 Lavaca St, Austin, TX 78701
- Austin, Texas 78201
- Design Firm Phone:
- (512) 573-5468