This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Construction of a 30,600 square-foot walking trail with an 8-foot-wide asphalt surface, a culvert system comprised of two 24-inch diameter HDPE pipes, and 11 solar street lights.