PROJECT
- Project Name:
- Chapel Creek Phase 7
- Project Number:
- TABS2025000716
- Facility Name:
- Chapel Creek Development
- Location Address:
- 1304 Alemeda St
- Fort Worth, TX 76108
- Location County:
- Tarrant
- Start Date:
- 10/2/2023
- Completion Date:
- 10/30/2024
- Estimated Cost:
- $106,331
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- 5612 SF of 4" concrete sidewalk, 24 barrier free ramps (P-1); removal of existing pavement (819 SF; connecting to existing pavement (4 connections).
- Square Footage:
- 5,612 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- SHARLYNN L,KEYS
- RAS #:
- 418
- RAS Address:
- 512 KEYES RD
- SUNSET, TX 76270
- RAS Phone:
- (940) 841-2951
OWNER
- Owner Name:
- Forestar (USA) Real Estate Group
- Owner Address:
- 2221 E LAMAR BLVD, STE 790
- ARLINGTON, Texas 76006
- Owner Phone:
- (919) 219-8635
- Contact Name:
- Claiborne Lord
DESIGN FIRM
- Design Firm Name:
- Shied Engineering Group
- Design Firm Address:
- 1600 W. 7th St., STE 400
- Fort Worth, Texas 76102
- Design Firm Phone:
- (817) 810-0696