PROJECT
- Project Name:
- Northeast Texas Trail - Avery Project (CSJ: 0901-27-054)
- Project Number:
- TABS2025005392
- Facility Name:
- CSJ: 0901-27-054
- Location Address:
- Fr: E. City Limits of Annona To: Bowie County Line
- Annona, TX 75550
- Location County:
- Red River
- Start Date:
- 6/5/2025
- Completion Date:
- 3/25/2026
- Estimated Cost:
- $2,426,501
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Construct 10ft-wide shared-use path. Include installation of unpaved aggregate surface shared-use path, bridge repair, drainage structures, handrails, signing and bollards.
- Square Footage:
- 1,800 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Review Complete
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 733-1748
OWNER
- Owner Name:
- TxDOT District: Paris
- Owner Address:
- 1365 N. Main Street
- Paris, Texas 75460
- Owner Phone:
- (903) 737-9300
- Contact Name:
- Duane Good, P.E.
DESIGN FIRM
- Design Firm Name:
- Pape-Dawson Engineers, Inc.
- Design Firm Address:
- 10801 North Mopac Expressway, Building 3 - Ste 200
- Austin, Texas 78759
- Design Firm Phone:
- (512) 454-8711