PROJECT
- Project Name:
- HMH Fondren 6 Restroom Renovation
- Project Number:
- TABS2025006777
- Facility Name:
- Houston Methodist Hospital - Fondren Building
- Location Address:
- 6565 Fannin Street
- Houston, TX 77070
- Location County:
- Harris
- Start Date:
- 12/15/2024
- Completion Date:
- 2/10/2025
- Estimated Cost:
- $150,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- Renovation of existing restrooms and locker room located on Fondren Level 6 to meet current accessibility requirements.
- Square Footage:
- 350 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Inspection Complete
RAS
- RAS Name:
- JEROMY G,MURPHY
- RAS #:
- 489
- RAS Address:
- 5026 YARWELL DR
- HOUSTON, TX 77096
- RAS Phone:
- (713) 864-8494
OWNER
- Owner Name:
- Houston Methodist Hospital
- Owner Address:
- 7550 Greenbriar Suite RB5-120
- Houston, Texas 77030
- Owner Phone:
- (832) 942-3243
- Contact Name:
- Dylan Payne
DESIGN FIRM
- Design Firm Name:
- C/V Architects
- Design Firm Address:
- 2304 Thomas Street
- Houston, Texas 77009
- Design Firm Phone:
- (832) 314-7871