PROJECT
- Project Name:
- SL 485 (CSJ: 3290-02-008)
- Project Number:
- TABS2025013027
- Facility Name:
- CSJ: 3290-02-008
- Location Address:
- From: US 271 To: US 80
- Gladewater, TX 75647
- Location County:
- Gregg
- Start Date:
- 9/28/2025
- Completion Date:
- 9/28/2028
- Estimated Cost:
- $1,996,298
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- WIDEN 2 LANES TO 4 LANES WITH FLUSH MEDIAN, SHARED-USE PATH, SIDEWALKS, CURB RAMPS AND CROSSWALKS.
- Square Footage:
- 118,122 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Review Complete
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 872-5054
OWNER
- Owner Name:
- TxDOT District: Tyler
- Owner Address:
- 2709 W. Front St.
- Tyler, Texas 75702
- Owner Phone:
- (903) 510-9100
- Contact Name:
- Brian Van Smoorenburg, P.E.
DESIGN FIRM
- Design Firm Name:
- BGE, Inc.
- Design Firm Address:
- 10777 Westheimer, Suite 400
- Houston, Texas 77042
- Design Firm Phone:
- (281) 558-8700