PROJECT
- Project Name:
- Fort Stockton Independent School District - Phase 1
- Project Number:
- TABS2025013756
- Facility Name:
- Apache Elementary School
- Location Address:
- 208 W 18th St.
- Fort Stockton, TX 79735
- Location County:
- Pecos
- Start Date:
- 1/6/2025
- Completion Date:
- 3/28/2025
- Estimated Cost:
- $150,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Remodel six (6) ~90sqft student restrooms to create single stall restrooms. MEP included. Remodel one (1) 130 sqft special education restroom.
- Square Footage:
- 670 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Inspection Complete
RAS
- RAS Name:
- STEPHEN D,MACPHIE
- RAS #:
- 307
- RAS Address:
- 4210 E MUNICIPAL DRIVE APT 6
- LUBBOCK, TX 79403
- RAS Phone:
- (806) 790-9227
OWNER
- Owner Name:
- Fort Stockton ISD
- Owner Address:
- 101 W Division St.
- Fort Stockton, Texas 79735
- Owner Phone:
- (432) 336-4000
- Contact Name:
- Gil Rey Madrid
DESIGN FIRM
- Design Firm Name:
- Curtis Pippin Design
- Design Firm Address:
- 1293 FM 859
- Edgewood, Texas 75117
- Design Firm Phone:
- (214) 477-8272