PROJECT
- Project Name:
- Life Cycle Curb and Gutter Replacement DO #2
- Project Number:
- TABS2025015228
- Facility Name:
- N/A
- Location Address:
- Holly Rd, Sean Dr, Theda Dr, Spencer Dr, Crescent Belmeade Dr, Orms Dr, Hugo Dr
- Corpus Christi, TX 78401
- Location County:
- Nueces
- Start Date:
- 4/15/2025
- Completion Date:
- 4/15/2026
- Estimated Cost:
- $919,828
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Replacement of accessible ramps and associated curb and sidewalk (8,320 SF)
- Square Footage:
- 8,320 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Inspection Complete
RAS
- RAS Name:
- STEVE R,ZOERNER
- RAS #:
- 1163
- RAS Address:
- STE C400 NO 545 166 HARGRAVES DR
- AUSTIN, TX 78737
- RAS Phone:
- (512) 731-9270
OWNER
- Owner Name:
- City of Corpus Christi
- Owner Address:
- 1201 Leopard Street
- Corpus Christi, Texas 78401
- Owner Phone:
- (361) 826-3676
- Contact Name:
- Mai Bernal
DESIGN FIRM
- Design Firm Name:
- Pape-Dawson Engineers
- Design Firm Address:
- 807 N. Upper Broadway, Suite 103
- Corpus Christi, Texas 78401
- Design Firm Phone:
- (361) 602-2273