PROJECT
- Project Name:
- White River MWD OHV Trail Restroom Facility
- Project Number:
- TABS2025015816
- Facility Name:
- Restroom Facility
- Location Address:
- 2880 FM 2794
- Spur, TX 79370
- Location County:
- Crosby
- Start Date:
- 6/15/2025
- Completion Date:
- 4/15/2026
- Estimated Cost:
- $400,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- The project shall include a 690 SF restroom and shower facility
- Square Footage:
- 690 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Inspection Complete
RAS
- RAS Name:
- STEPHEN D,MACPHIE
- RAS #:
- 307
- RAS Address:
- 4210 E MUNICIPAL DRIVE APT 6
- LUBBOCK, TX 79403
- RAS Phone:
- (806) 790-9227
OWNER
- Owner Name:
- White River Municipal Water District
- Owner Address:
- 2880 FM 2794
- Spur, Texas 79370
- Owner Phone:
- (806) 263-4240
- Contact Name:
- Shane Jones
DESIGN FIRM
- Design Firm Name:
- Jacob Martin, LLC
- Design Firm Address:
- 4920 South Loop 289, Suite 106
- Lubbock, Texas 79414
- Design Firm Phone:
- (806) 368-6375