PROJECT
- Project Name:
- US 84, etc. (CSJ: 0034-01-130, etc.)
- Project Number:
- TABS2025024212
- Facility Name:
- CSJ: 0034-01-130, etc.
- Location Address:
- Fr.: US 83/84 at CR 154 to US 84 at CR 131
- Tuscola, TX 79562
- Location County:
- Taylor
- Start Date:
- 3/9/2026
- Completion Date:
- 9/17/2029
- Estimated Cost:
- $1,414,410
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Construct a new grade separated interchange with four main lanes, four frontage roads and shared use path.
- Square Footage:
- 109,104 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Review Complete
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 872-5054
OWNER
- Owner Name:
- TxDOT District: Abilene
- Owner Address:
- 4250 N. Clack
- Abilene, Texas 79601
- Owner Phone:
- (325) 676-6800
- Contact Name:
- Bryce Turentine, P.E.
DESIGN FIRM
- Design Firm Name:
- H W Lochner, Inc.
- Design Firm Address:
- 710 Hesters Crossing, Suite 110
- Round Rock, Texas 78681
- Design Firm Phone:
- (737) 704-3080