This project is privately funded, on private land for private use.
Scope of Work:
Paving the undeveloped lot and installing the following equipment: (16) BTC DC fast charging dispensers, (8) BTC power units, (1) switchboard assembly, (1) utility transformer and related infrastructure, and (1) utility meter.