PROJECT
- Project Name:
- Buffalo Bayou Greenway Bridge Package (BU06C)
- Project Number:
- TABS2026008129
- Facility Name:
- N/A
- Location Address:
- 5353 Memorial Drive
- Houston, TX 77007
- Location County:
- Harris
- Start Date:
- 3/1/2026
- Completion Date:
- 12/31/2026
- Estimated Cost:
- $1,865,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Proposed pedestrian bridge with approx 4700sf of trail for future connections
- Square Footage:
- 4,700 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Registered
RAS
- RAS Name:
- KATHY S,RODRIGUEZ
- RAS #:
- 1273
- RAS Address:
- 7171 HIGHWAY 6 N SUITE 285
- HOUSTON, TX 77095
- RAS Phone:
- (713) 975-1029
OWNER
- Owner Name:
- Houston Parks Board
- Owner Address:
- 300 N Post Oak Lane
- Houston, Texas 77024
- Owner Phone:
- (713) 942-8500
- Contact Name:
- John Brandt
DESIGN FIRM
- Design Firm Name:
- Halff
- Design Firm Address:
- 14800 St Mary's Lane, Suite 160
- Houston, Texas 77079
- Design Firm Phone:
- (713) 380-4366