This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Convert existing natural turf football field to synthetic turf and resurface existing track. Add two new 375 sq.ft. storage sheds to track and one 250 sq.ft. press box to the existing bleachers. Change out the existing field lighting to LED