NOTICE:
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2025017921 Registration Date: 4/30/2025
PROJECT
- Project Name:
- ACE 2 West - Phase 1
- Project Number:
- TABS2025017921
- Facility Name:
- Alliance Center East Bldg 2
- Location Address:
- 2601 Spirit Drive, Fort Worth TX 76177
- Fort Worth, TX 76177
- Location County:
- Tarrant
- Start Date:
- 5/5/2025
- Completion Date:
- 11/5/2025
- Estimated Cost:
- $1,998,672
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- New insulation will be added to a production studio space and the existing industrial building.
- Square Footage:
- 82,570 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
- Project Closed
PERSON FILING FORM
- Contact Name:
- Chase Randolph
RAS
- RAS Name:
- CLINTON L,COULTAS
- RAS #:
- 1573
- RAS Address:
- 3905 TITAN TRL
- DENTON, TX 76209
- RAS Phone:
- (940) 240-0491
OWNER
- Owner Name:
- Alliance Center East No. 2, Ltd.
- Owner Address:
- 9800 Hillwood Parkway, Suite 300
- Fort Worth, Texas 76177
- Owner Phone:
- (817) 224-6368
- Contact Name:
- Robert Spann
TENANT
Not Assigned
DESIGN FIRM
- Design Firm Name:
- RGA Architects, Inc.
- Design Firm Address:
- 301 S Oak St. Suite 100
- Roanoke, Texas 76262
- Design Firm Phone:
- (817) 430-3382