NOTICE:
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2019015119 Registration Date: 6/28/2019
PROJECT
- Project Name:
- Star Phase 3
- Project Number:
- TABS2019015119
- Facility Name:
- Star Phase 3
- Location Address:
- Hall of Fame Lane
- Frisco, TX 75034
- Location County:
- Collin
- Start Date:
- 7/28/2019
- Completion Date:
- 6/28/2021
- Estimated Cost:
- $95,000,000
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- 16 Levels of New Construction Office Tower - 10 levels of garage and 6 levels of office 358,496 Office 594,698 Garage. Building located on the South side of Hall of Fame Lane and east side of Gridiron Road.
- Square Footage:
- 953,194 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
- Project Closed
PERSON FILING FORM
- Contact Name:
- Kimberly Goss
RAS
- RAS Name:
- KIMBERLY J,GOSS
- RAS #:
- 51
- RAS Address:
- 12720 HILLCREST RD STE 580
- DALLAS, TX 75230
- RAS Phone:
- (214) 348-7758
OWNER
- Owner Name:
- Blue Star Land Phase III, LLC - Mark Hickman
- Owner Address:
- 8000 Warren Parkway
- Frisco, Texas 75034
- Owner Phone:
- (214) 437-3653
- Contact Name:
TENANT
Not Assigned
DESIGN FIRM
- Design Firm Name:
- HKS Inc.
- Design Firm Address:
- 350 N. St. Paul, Suite 100
- Dallas, Texas 75201
- Design Firm Phone:
- (214) 969-5599