NOTICE:
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2020022370 Registration Date: 8/18/2020
PROJECT
- Project Name:
- Partial Interior Finish Out
- Project Number:
- TABS2020022370
- Facility Name:
- Village at the Summit
- Location Address:
- 4907 NW Loop 410
- San Antonio, TX 78229
- Location County:
- Bexar
- Start Date:
- 9/25/2020
- Completion Date:
- 11/30/2020
- Estimated Cost:
- $274,950
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- Interior finish out including electrical and plumbing. Site work to be completed at pending date.
- Square Footage:
- 9,165 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
- Project Closed
PERSON FILING FORM
- Contact Name:
- Mark Neville
RAS
- RAS Name:
- DOUG W,MARTINE
- RAS #:
- 1162
- RAS Address:
- 366 UPLAND CT
- CANYON LAKE, TX 78133
- RAS Phone:
- (210) 912-3779
OWNER
- Owner Name:
- SUMMIT INCOME PARTNERS LP & JBG SUMMIT LLC
- Owner Address:
- 3345 BEE CAVES RD STE 208
- WEST LAKE HILLS, Texas 78746
- Owner Phone:
- (512) 610-6600
- Contact Name:
- Scott Butcher
TENANT
Not Assigned
DESIGN FIRM
Not Assigned