NOTICE:
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2021012489 Registration Date: 4/1/2021
PROJECT
- Project Name:
- PIEOLOGY EASTLAKE
- Project Number:
- TABS2021012489
- Facility Name:
- PIEOLOGY EASTLAKE
- Location Address:
- 13371-20 EASTALKE BLVD
- Horizon City, TX 79928
- Location County:
- El Paso
- Start Date:
- 4/1/2021
- Completion Date:
- 6/15/2021
- Estimated Cost:
- $126,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- This will be a TI project to be a Pieology restaurant with sit-down dining.
- Square Footage:
- 1,800 ft 2
- Are the private funds provided by the tenant?
- Yes
- Current Status:
- Project Closed
PERSON FILING FORM
- Contact Name:
- Abril Parra
RAS
- RAS Name:
- ABRIL PAOLA,PARRA
- RAS #:
- 1397
- RAS Address:
- 2619 E MISSOURI AVE
- EL PASO, TX 79903
- RAS Phone:
- (915) 727-0537
OWNER
- Owner Name:
- ROP EASTLAKE LLC
- Owner Address:
- 5678 N. MESA ST
- EL PASO, Texas 79912
- Owner Phone:
- (915) 225-5700
- Contact Name:
- ADAM FRANK
TENANT
- Tenant Name:
- TRIPLE PIE GROUP LLC
- Tenant Phone:
- (915) 892-0489
DESIGN FIRM
- Design Firm Name:
- MICHAEL WALKER
- Design Firm Address:
- 8021 TONTO PL
- EL PASO, Texas 79904
- Design Firm Phone:
- (915) 781-8200