NOTICE:
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2021015888 Registration Date: 5/18/2021
PROJECT
- Project Name:
- Camp Swift Readiness Center Major Maintenance
- Project Number:
- TABS2021015888
- Facility Name:
- Camp Swift Readiness Center
- Location Address:
- 1705 TX-95
- Bastrop, TX 78602
- Location County:
- Bastrop
- Start Date:
- 8/1/2021
- Completion Date:
- 12/31/2022
- Estimated Cost:
- $7,000,000
- Type of Work:
- Additions to Existing Building
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Modernization of the Texas Army National Guard's Camp Swift Readiness Center Facility to mitigate current health, safety, and code deficiencies, as well as improve mission capabilities
- Square Footage:
- 1 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
- Project Closed
PERSON FILING FORM
- Contact Name:
- Ross Thomas
RAS
- RAS Name:
- ROSS A,THOMAS
- RAS #:
- 1241
- RAS Address:
- 1407 W UNIVERSITY DR
- MCKINNEY, TX 75069
- RAS Phone:
- (469) 964-2682
OWNER
- Owner Name:
- Texas Military Department, CFMO
- Owner Address:
- 2200 W. 35th Street Camp Mabry
- Austin, Texas 78703
- Owner Phone:
- (512) 782-5500
- Contact Name:
TENANT
Not Assigned
DESIGN FIRM
- Design Firm Name:
- Garver, LLC
- Design Firm Address:
- 3755 S. Capital of Texas Hwy. #325
- Austin, Texas 78704
- Design Firm Phone:
- (501) 537-3228