Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2021020551 Registration Date: 7/23/2021
PROJECT
- Project Name:
- I-2/I-69C Interchange Project
- Project Number:
- TABS2021020551
- Facility Name:
- I-2/I-69C Interchange Project
- Location Address:
- I-2/I-69C Interchange
- Pharr, TX 78577
- Location County:
- Hidalgo
- Start Date:
- 10/1/2021
- Completion Date:
- 12/31/2024
- Estimated Cost:
- $300,000,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- The propsed project limits on I-2 are from 2nd Street in McAllen to FM 2557 (Stewart Rd) in San Juan and I-69C from Nolana Loop to 1-2 in Pharr. Provide two lane directs connectors. Reconfigure on and off ramps to optimize mobility. Prioritze operati
- Square Footage:
- 11,386,329 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
- Review Complete
PERSON FILING FORM
- Contact Name:
- Jeromy Murphy
RAS
Not Assigned
OWNER
- Owner Name:
- Texas Department of Transportation
- Owner Address:
- 3700 N. Cage Blvd.
- Pharr, Texas 78577
- Owner Phone:
- (956) 249-4068
- Contact Name:
- Sebastian Salinas
TENANT
Not Assigned
DESIGN FIRM
- Design Firm Name:
- Michael Baker International
- Design Firm Address:
- 1501 Lyndon B Johnson Fwy, Ste 650
- Dallas, Texas 75234
- Design Firm Phone:
- (469) 801-8531