NOTICE:
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2022005236 Registration Date: 11/12/2021
PROJECT
- Project Name:
- Maridoe Golf Club
- Project Number:
- TABS2022005236
- Facility Name:
- Halfway House
- Location Address:
- 2020 Kelly Blvd.
- Carrollton, TX 75006
- Location County:
- Dallas
- Start Date:
- 1/2/2022
- Completion Date:
- 5/15/2022
- Estimated Cost:
- $531,000
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- This will be a 1,162 SF comfort station for the Maridoe Golf Club which includes a covered porch, snack/drink bar, (2) restrooms, storage and a mechanical room.
- Square Footage:
- 1,162 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
- Review Complete
PERSON FILING FORM
- Contact Name:
- Jeffery Kelley
RAS
Not Assigned
OWNER
- Owner Name:
- MA Columbian, LLC dba/Maridoe Golf Club
- Owner Address:
- 2020 Kelly Boulevard
- Carrollton, Texas 75006
- Owner Phone:
- 214-979-6313
- Contact Name:
- Rodney Nanez
TENANT
Not Assigned
DESIGN FIRM
- Design Firm Name:
- Ware Malcomb
- Design Firm Address:
- 1919 McKinney Avenue #100
- Dallas, Texas 75201
- Design Firm Phone:
- 281.661.4789