Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2022018296 Registration Date: 5/5/2022
PROJECT
- Project Name:
- S. Gevers Street Drainage Improvements
- Project Number:
- TABS2022018296
- Facility Name:
- S. Gevers Street
- Location Address:
- Gevers St, San Antonio, TX
- San Antonio, TX 78210
- Location County:
- Bexar
- Start Date:
- 7/5/2022
- Completion Date:
- 5/6/2024
- Estimated Cost:
- $160,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- This project consists of the full depth reconstruction of 1,120 LF on S. Gevers St., 1,189 LF on Nopal St., 442 LF on Minnetonka St., 672 LF on Hiawatha St., and the addition of curb and sidewalks.
- Square Footage:
- 9 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
- Project Closed
PERSON FILING FORM
- Contact Name:
- Marwin Lopez
RAS
- RAS Name:
- PETER F,GROJEAN
- RAS #:
- 75
- RAS Address:
- 218 MAVERICK ST
- SAN ANTONIO, TX 78212
- RAS Phone:
- (210) 271-1014
OWNER
- Owner Name:
- City of San Antonio
- Owner Address:
- 100 W. Houston St. 15th Floor
- San Antonio, Texas 78205
- Owner Phone:
- 210.207.4605
- Contact Name:
- Juan Contreras
TENANT
Not Assigned
DESIGN FIRM
- Design Firm Name:
- HDR, inc.
- Design Firm Address:
- 613 NW Loop 410 Suite 700
- San Antonio, Texas 78216
- Design Firm Phone:
- (210) 841-2832