NOTICE:
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2023002729 Registration Date: 10/7/2022
PROJECT
- Project Name:
- MCKINNEY FIRST BAPTIST CHURCH
- Project Number:
- TABS2023002729
- Facility Name:
- EXCERCISE ROOM
- Location Address:
- 401 W ERWIN AVE.
- Mckinney, TX 75069
- Location County:
- Collin
- Start Date:
- 11/2/2023
- Completion Date:
- 6/2/2024
- Estimated Cost:
- $400,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- REMODEL OF THE SANCTUARY
- Square Footage:
- 2,616 ft 2
- Are the private funds provided by the tenant?
- Yes
- Current Status:
- Project Closed
PERSON FILING FORM
- Contact Name:
- Brandon Quimbey
RAS
- RAS Name:
- BRANDON MARK,QUIMBEY
- RAS #:
- 1534
- RAS Address:
- 431 GENOA CT
- PRINCETON, TX 75407
- RAS Phone:
- (214) 632-5676
OWNER
- Owner Name:
- DARIAN CULBERTSON
- Owner Address:
- 401 W ERWIN AVE.
- MCKINNEY, Texas 75069
- Owner Phone:
- (214) 264-1576
- Contact Name:
TENANT
Not Assigned
DESIGN FIRM
- Design Firm Name:
- TLS ARCHITECT LLC
- Design Firm Address:
- 1615 BARCLAY DR.
- CARROLLTON, Texas 75007
- Design Firm Phone:
- (214) 533-9899