NOTICE:
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2023009159 Registration Date: 1/11/2023
PROJECT
- Project Name:
- New Building Complex for The Shack
- Project Number:
- TABS2023009159
- Facility Name:
- The Shack
- Location Address:
- Eastlake Blvd.
- Horizon City, TX 79928
- Location County:
- El Paso
- Start Date:
- 2/1/2023
- Completion Date:
- 10/31/2023
- Estimated Cost:
- $2,000,000
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- 3 Freestanding shell buildings made of cmu with EIFS finish. Bldg. 1 is 5,000 SF, Bldg. 2 is 3,200 SF, and Bldg. 3 & 4 are 800 SF respectively.
- Square Footage:
- 9,800 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
- Review Complete
PERSON FILING FORM
- Contact Name:
- Eckhard Fennig
RAS
Not Assigned
OWNER
- Owner Name:
- Michael Soto
- Owner Address:
- 3049 McRae Blvd.
- El Paso, Texas 79925
- Owner Phone:
- (915) 444-2848
- Contact Name:
- Michael Soto
TENANT
Not Assigned
DESIGN FIRM
- Design Firm Name:
- Carl Daniel Architects
- Design Firm Address:
- 305 Leon St.
- El Paso, Texas 79901
- Design Firm Phone:
- 915-533-2700