Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2023009253 Registration Date: 1/12/2023
PROJECT
- Project Name:
- South Main Street Drainage Improvements Project, Phase 2
- Project Number:
- TABS2023009253
- Facility Name:
- South Main Street
- Location Address:
- 109 South Main Street
- Baytown, TX 77520
- Location County:
- Harris
- Start Date:
- 5/10/2023
- Completion Date:
- 6/5/2024
- Estimated Cost:
- $3,400,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Remove and replace a portion of South Main Street to increase the size of the storm sewer below ground (this is the only portion in the public ROW), improve an existing Harris County Flood Control District channel, add a detention basin
- Square Footage:
- 350,000 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
- Project Registered
PERSON FILING FORM
- Contact Name:
- Heather Harris
RAS
Not Assigned
OWNER
- Owner Name:
- City of Baytown
- Owner Address:
- 2123 Market St
- Baytown, Texas 77523
- Owner Phone:
- (281) 420-7127
- Contact Name:
- Roshan Chaudhary
TENANT
Not Assigned
DESIGN FIRM
- Design Firm Name:
- Carollo Engineers
- Design Firm Address:
- 10375 Richmond Ave Suite 1625
- Houston, Texas 77042
- Design Firm Phone:
- (281) 961-6172