NOTICE:
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
All registered projects will now require the County Appraisal District (CAD) number and the CAD document to be uploaded to TABS. Along with the CAD number and document, the Limited Liability Ownership (LLO) form will be required to be completed in full and uploaded to TABS when the building owner is a Limited Liability Corporation (LLC), Limited Liability Partnership (LLP) or Limited Partnership (LP). With an LLC, LLP or LP, a copy of the Articles of Formation (AOF) or copy of the Texas Secretary of State (SOS) document must also be uploaded.
The above documents must be available for upload at the time of registration OR at the time of updating an existing project, please be prepared with the (correct) required documents to upload to avoid delays.
WARNING:
False or misleading information provided when submitting registration forms or project information to the Department is a violation of Texas Administrative Code 68.12(e).
Texas Department of Licensing and Regulation
Architectural Barriers Project Details Page
Project #: TABS2023024415 Registration Date: 7/25/2023
PROJECT
- Project Name:
- East Fork SUD
- Project Number:
- TABS2023024415
- Facility Name:
- East Fork SUD
- Location Address:
- 1355 Troy Road
- Wylie, TX 75098
- Location County:
- Collin
- Start Date:
- 8/7/2023
- Completion Date:
- 5/10/2024
- Estimated Cost:
- $323,500
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- new ground-up site work, utilities, PEMB and interior offices, metal canopy car covers
- Square Footage:
- 1,300 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
- Project Registered
PERSON FILING FORM
- Contact Name:
- Jeffrey Carroll
RAS
Not Assigned
OWNER
- Owner Name:
- East Fork SUD
- Owner Address:
- 1355 Troy Road
- Wylie, Texas 75098
- Owner Phone:
- (972) 784-7777
- Contact Name:
TENANT
Not Assigned
DESIGN FIRM
- Design Firm Name:
- Dunaway Engineering
- Design Firm Address:
- 118 McKinney Street
- Farmersville, Texas 75442
- Design Firm Phone:
- (972) 784-7777